- Tên dự án:
- Mustla Bridge
- Địa điểm:
- Estonia
- Thời gian thi công:
- 2019
- Người thiết kế:
- Geoman Ltd.
- Dự án:
- Reinforced Earth retaining structure using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 44,5m
Height (including base block): 4,6 m
The Redi-Rock PC is a reinforced earth retaining wall solution based on the standard Redi-Rock segmental mass-gravity system. A 300mm wide strip of geogrid is pulled through the core of the block and is laid with a layer level with the base of the block and one at the top. Any tension is balanced by that in the other layer, preventing the grid from being pulled through the block. This creates a strong, consistent facing connection that does not vary in capacity with depth. - Phần mềm:
-
GEO 5 - Tường đá Redi-Rock (lắp ghép)
- Tài liệu:
-
redi-rock-wall-estonia-bridge-abutment.pdf
Redi-Rock Wall - Mustla Bridge Abutment Design, Estonia
Project Gallery Leaflet - Mustla Bridge Estonia
Metro Line C, Prague, Czech Republic
- Tên dự án:
- Construction of Metro Line C
- Địa điểm:
- Prague - Ladvi - Letnany, Czech republic
- Thời gian thi công:
- 2002–2007
- Người thiết kế:
- METROPROJEKT Praha, a. s.,
Ing. Jaroslav Kopecny - Phần mềm:
-
GEO 5 - Thiết kế hàng ván cừ
GEO 5 - Kiểm tra tường cừ
Project Galerry - Tàu điện ngầm Praha
Concrete sewer, Slatina, Romania
- Tên dự án:
- Concrete sewer - Slatina
- Địa điểm:
- Slatina, jud. Olt, Romania
- Thời gian thi công:
- 2014
- Người thiết kế:
- Proexrom, Romania
- Phần mềm:
-
GEO 5 - Mái dốc neo
Project Gallery Leaflet - Concrete Sewer
Nádraží Veleslavín Station, Prague, Czech Republic
- Tên dự án:
- Nádraží Veleslavín Station, Metro V.A, Prague
- Địa điểm:
- Prague, Czech Republic
- Thời gian thi công:
- 2011 - 2014
- Người thiết kế:
- Metroprojekt Praha a.s.
Ing. Martina Urbánková - Dự án:
- Three-aisled station
Length: 100m
Maximum width: 22.34 m
Maximum height: 10.25 m
Side of the excavation area 70.6 m2
Secondary excavation area 42.9 m2 - Phần mềm:
-
GEO 5 - PTHH
Project Galerry - Bến tàu điện ngầm Nádraží Veleslavín
Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road, Saudi Arabia
- Tên dự án:
- Tunnel at the Intersection of King Abdulaziz Road with Abu Baker Road
- Địa điểm:
- Saudi Arabia
- Thời gian thi công:
- 2017-2018
- Người thiết kế:
- Civil Engr. Al-Hussain Hassan
- Dự án:
- Tunnel Length:650 M
Depth of excavation: 15.0m
Number of rows of anchors: 5
Distance between anchors: 3.0m
Contractor: Jeddah Foundation Company - Phần mềm:
-
GEO 5 - Kiểm tra tường cừ
Bridge “Las Ferias Av”, Venezuela
- Tên dự án:
- Bridge “Las Ferias Av”
- Địa điểm:
- Valencia City, Venezuela
- Thời gian thi công:
- 2015
- Người thiết kế:
- Sismica C.A. Ing. Edinson Guanchez (Msc, Esp)
- Dự án:
- Total Deck Length = 139 m (4 spans)
Maximum span length = 36 m
Access Ramps Length = 250 m
Total Bridge Length = 389 m - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường MSE
GEO 5 - Trụ cầu
GEO 5 - Cọc
GEO 5 - Nhóm cọc
- Tài liệu:
-
additional-description-and-drawings.pdf
Deep Excavation in Prishtina, Kosovo
- Tên dự án:
- Deep Excavation - Anchored Diaphragm Wall
- Địa điểm:
- Prishtina, Kosovo
- Thời gian thi công:
- 2018
- Người thiết kế:
- "Geotest Engineering", Prishtinë
Dr. Ing. Qani V. Kadiri
Ing. Adrian Kadiri - Dự án:
- Depth of excavation: 19.5m
Thickness of diaphragm wall: 0.6m
Number of rows of anchors: 5
Distance between anchors: 2.5m
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Kiểm tra tường cừ
- Tài liệu:
-
deep-excavation-in-prishtina.pdf
12-meter high Gabion Wall, Mexico
- Tên dự án:
- 12-meter high Gabion Wall
- Địa điểm:
- Guanajuato, Gto. México
- Thời gian thi công:
- 2015
- Người thiết kế:
- Ing. Pedro J. Villarreal Pinzón
TREE CONTACTO S.A. DE C.V. - Phần mềm:
-
GEO 5 - Kết cấu tường chắn rọ đá
- Tài liệu:
-
PDF - GEO5 - Gabion report
Athienou Sewage Treatment Plant and associated works, Cyprus
- Tên dự án:
- Athienou Sewage Treatment Plant and associated works
- Địa điểm:
- Cyprus
- Thời gian thi công:
- 2015 - 2017
- Người thiết kế:
- Ioannis Pericleous, MSc, CEng, MIStructE
- Dự án:
- The project was a Design, Build, Operate contract and it included a sewage treatment plant with RC water tanks, one water retaining earth lagoon with capacity 100.000m3 and one 3.000m3. Project also included the design of several other associated works, such roads, 4no. Pumping stations located in Athienou community approx. 8m deep each, building irrigation network, etc.
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tính lún
-
Line 4 Metro, Budapest, Hungary
- Tên dự án:
- Budapest Metro Line 4
- Địa điểm:
- Keleti Railway Station - Budapest, Hungary
- Thời gian thi công:
- 2007
- Người thiết kế:
- Goda Balázs, Honti Imre, Huszka Gábor Főmterv Zrt.
- Phần mềm:
-
GEO 5 - Kiểm tra tường cừ
Office buildings, Madrid, Spain
- Tên dự án:
- Construction office buildings “Quinta de los Molinos”
- Địa điểm:
- Madrid, España
- Thời gian thi công:
- 2004-2005
- Người thiết kế:
- Daniel Danés Grases
- Phần mềm:
-
GEO 5 - PTHH
GEO 5 - Mái dốc neo
Drilled piles, Brasilia, Brazil
- Tên dự án:
- Drilled piles
- Địa điểm:
- Brasilia, Brazil
- Thời gian thi công:
- 2003–2005
- Người thiết kế:
- Renato P. Cunha, MSc, PhD
- Phần mềm:
-
GEO 5 - Thiết kế hàng ván cừ
GEO 5 - Kiểm tra tường cừ
Gabion revetments, Ostrowo, Poland
- Tên dự án:
- Gabion revetments – Jastrzębia Góra – Ostrowo
- Địa điểm:
- Jastrzębia Góra – Ostrowo, Poland
- Thời gian thi công:
- 2012
- Người thiết kế:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Phần mềm:
-
GEO 5 - Kết cấu tường chắn rọ đá
- Tài liệu:
-
geo5-report-ostrowo.pdf
High-rise building, Istanbul, Turkey
- Tên dự án:
- High-rise building
- Địa điểm:
- Istanbul, Turkey
- Thời gian thi công:
- 2007
- Người thiết kế:
- NYS Project Consultancy and Constracting Co.
Ing. Yavuz Seymen - Phần mềm:
-
GEO 5 - Thiết kế hàng ván cừ
GEO 5 - Kiểm tra tường cừ
High-rise building Soyak, Istanbul, Turkey
- Tên dự án:
- High-rise building Soyak
- Địa điểm:
- Istanbul, Turkey
- Thời gian thi công:
- 2011-2012
- Người thiết kế:
- NYS Constructıon
- Dự án:
- Excavation depth: 32,5m
Piles installed: 10,700m
Anchors installed: 71,000m
Soil excavation: 205.000 m3 - Phần mềm:
-
GEO 5 - Kiểm tra tường cừ
Kanianka dam, Slovakia
- Tên dự án:
- Kanianka dam
- Địa điểm:
- Town of Kanianka, Slovakia
- Thời gian thi công:
- 2004
- Người thiết kế:
- Overall verification: Ing. Andrej Kasana
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - PTHH
New Connection, Prague, Czech Republic
- Tên dự án:
- New Connection Prague
- Địa điểm:
- Prague Main Station - Masaryk’s Station – Liben - Vysocany, Czech republic
- Thời gian thi công:
- 2004–2010
- Người thiết kế:
- Ing.Miroslav Sedivy
- Phần mềm:
-
GEO 5 - PTHH
Pedestrian tunnel, Gdansk, Poland
- Tên dự án:
- Pedestrian tunnel – Gdansk
- Địa điểm:
- Gdańsk, Poland
- Thời gian thi công:
- 2013
- Người thiết kế:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Phần mềm:
-
GEO 5 - PTHH – Hầm
Q22 Excavation Pit, Warsaw, Poland
- Tên dự án:
- Q22 Excavation Pit, Warsaw, Poland
- Địa điểm:
- Warsaw, Poland
- Thời gian thi công:
- 2013 - 2016
- Người thiết kế:
- Buro Happold Polska Sp. z o.o.
Maciej Sobotkowski, MSc. Eng.
Zbigniew Czajewski, MSc. Eng. - Dự án:
- 155 meters high office building with 5 underground levels. The depth of the excavation pit is more than 20 meters.
- Phần mềm:
-
GEO 5 - Kiểm tra tường cừ
Retaining walls RediRock, Newport, USA
- Tên dự án:
- Sanville memorial public works facility
- Địa điểm:
- Newport, USA
- Thời gian thi công:
- 2008
- Người thiết kế:
- Souhegan Valley Engineering Inc.
New Hampshire, Newport USA - Phần mềm:
-
-
Shopping Center and Housing Project, Antalya, Turkey
- Tên dự án:
- Shopping Center
- Địa điểm:
- Antalya, Turkey
- Thời gian thi công:
- 2009-2010
- Người thiết kế:
- NYS Constructıon
- Dự án:
- Excavation depth: 24m
Bored Piles installed: 18,000m
Anchors installed: 108,000m - Phần mềm:
-
GEO 5 - Kiểm tra tường cừ
Temporary containment of terrain, Tenerife Norte, Spain
- Tên dự án:
- Temporary containment of terrain
- Địa điểm:
- Valle Colino, Tenerife Norte, Spain
- Thời gian thi công:
- 2006
- Người thiết kế:
- Francisco Javier Cruz García
- Phần mềm:
-
GEO 5 - Mái dốc neo
Tesare dam, Tesare, Slovakia
- Tên dự án:
- Tesare dam
- Địa điểm:
- Town of Tesare, Slovakia
- Thời gian thi công:
- 2004
- Người thiết kế:
- Overall verification: Ing. Andrej Kasana
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - PTHH
Tunnel ventilation access, Lérida, Spain
- Tên dự án:
- Tunnel ventilation in AVE and Lérida access
- Địa điểm:
- Avenue Once de Septiembre, Lérida, España
- Thời gian thi công:
- 2008
- Người thiết kế:
- Ignacio Zuloaga
- Phần mềm:
-
GEO 5 - PTHH
VMO Dobrovského, Prague, Czech Republic
- Tên dự án:
- VMO Dobrovského Brno
- Địa điểm:
- Road I/42 Brno, Czech republic
- Thời gian thi công:
- 2002–2005
- Người thiết kế:
- Ing. Jaroslav Lacina
- Phần mềm:
-
GEO 5 - PTHH
Waterworks Hosterwitz, Dresden, Germany
- Tên dự án:
- Waterworks Hosterwitz
- Địa điểm:
- Dresden - Hosterwitz, Germany
- Thời gian thi công:
- 2012
- Người thiết kế:
- G.E.O.S. Ingenieurgesellschaft mbH
Dipl. – Ing. Juraj Ortuta, Dipl. – Ing. Andreas Köhler - Dự án:
- Safety assessment of complex of buildings for planned increase of flood control waterworks Hosterwitz.
- Phần mềm:
-
GEO 5 - PTHH
Newry, Ireland - Dominican Chapel, Ireland
- Tên dự án:
- Newry, Ireland - Dominican Chapel
- Địa điểm:
- Newry, Northern Ireland
- Thời gian thi công:
- 2017
- Người thiết kế:
- Geoman Ltd.
Liam K.D. - Dự án:
- Landscaping by MacWall system with NFC Fill.
Wall height: from 1.8 m to 3.6 m
Total number of walls: 5
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường MSE
- Tài liệu:
-
PDF - Additional information about the project (detailed description, photos, documentation)
El Cerrillo Park Comenar Viejo, Spain
- Tên dự án:
- El Cerrillo Park Comenar Viejo
- Địa điểm:
- Madrid, Spain
- Thời gian thi công:
- 2019
- Người thiết kế:
- Wall Designer: Geoman Ltd.
Redi-Rock Supplier: Memorial Parks - Dự án:
- Reinforced retaining wall using Redi-Rock PC System (Positive Connection)
Length of the whole structure: 70,2m
Max. height: 5,02 m
GEO5 Prefab Wall was used to assess the suitability of sheets of Geotextile reinforcement with a friction connection between blocks when the walls surpassed achievable heights using mass gravity, the Redi-Rock Wall module was used for standard Gravity analysis while the Stability Module provided global analysis for all sections considered.
The wall was founded on competent medium-dense granite sand and designed using the Spanish adaption of EC7 (UNE-EN 1997-1:2004) and associated annex.
The local soil group is described as Leptosols. The soil unit was described as Lithic and Dystric. - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường đúc sẵn
Brantham, Suffolk - Two reinforced walls, UK
- Tên dự án:
- Brantham, Suffolk - Two reinforced walls
- Địa điểm:
- Brantham, Suffolk, UK
- Thời gian thi công:
- 2021
- Người thiết kế:
- Kenneth Knox, Stabilisure Ltd.
- Dự án:
- Two 5.3m high, 70m long Rootlok hybrid nailed MSE walls at Stour view.
Number of rows of soil nails: 7
Nails distance: approx. 80cm
Total length of the supporting structure: 70m - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường MSE
- Tài liệu:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Allenton, Derby - Ecocrib retaining wall, UK
- Tên dự án:
- Allenton, Derby - Ecocrib retaining wall
- Địa điểm:
- Allenton, Derby, UK
- Thời gian thi công:
- 2020
- Người thiết kế:
- William Morrow (Geoman Ltd.)
Installer/ material supplier: PC Construction - Dự án:
- Ecocrib retaining wall - 100% recycled mixed polymer retaining crib wall system.
Maximum retained height: 4.1m
Total length: 50m - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường đúc sẵn
- Tài liệu:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Lawley Village Phase 10, Telford, UK
- Tên dự án:
- Lawley Village Phase 10, Telford
- Địa điểm:
- Lawley Village, Telford
- Thời gian thi công:
- 2021
- Người thiết kế:
- Kenneth Knox
Geoman Ltd. - Dự án:
- Height of reinforced slope: up to 6m
Total length of the slope: 300m
Slope stabilization technology: soil bag facing - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Tường MSE
- Tài liệu:
-
PDF - Additional information about the project (detailed description, photos, documentation)
Building of World Trade Center Asuncion
- Tên dự án:
- Building of World Trade Center Asuncion
- Địa điểm:
- Asunción - Paraguay
- Thời gian thi công:
- 2012
- Người thiết kế:
- Ing. Augusto J. Leoni
- Dự án:
- Pile curtain with not pre-tensioned (passive) anchors.
Depth of excavation: 16 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: 2.50 m - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Kiểm tra tường cừ
Expansion of shopping center Shopping del Sol
- Tên dự án:
- Expansion of shopping center Shopping del Sol
- Địa điểm:
- Asunción - Paraguay
- Thời gian thi công:
- 2014
- Người thiết kế:
- Ing. Augusto J. Leoni
- Dự án:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 to 18 m
Diameter of piles: 0,23 m
Piles spacing: 0,90 m
Number of rows of anchors: 4
Distance between anchors: Variable - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Kiểm tra tường cừ
Apartment house Eminent
- Tên dự án:
- Apartment house Eminent - Asunción
- Địa điểm:
- Asunción - Paraguay
- Thời gian thi công:
- 2015
- Người thiết kế:
- Ing. Augusto J. Leoni
- Dự án:
- Pile curtain with pre-tensioned (active) anchors.
Deep of excavation: from 14 m
Diameter of piles: 0.23 m
Piles spacing: 0.90 m
Number of rows of anchors: 5
Distance between anchors: Variable - Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Kiểm tra tường cừ
Paseo del Bajo parking in front of the Casa Rosada
- Tên dự án:
- Paseo del Bajo parking in front of the Casa Rosada
- Địa điểm:
- Argentina - Buenos Aires
- Thời gian thi công:
- 2019
- Dự án:
- The construction pit is in close proximity to the historic sewerage system, which is more than 100 years old. The front of the excavation at a distance of only 6m from the sewer.
Depth of excavation: 10,5 m
Number of rows of anchors: 4
Distance between anchors: 2.50 m - Phần mềm:
-
GEO 5 - PTHH
GEO 5 - Kiểm tra tường cừ
Design of a Rock Slope
- Tên dự án:
- Design of a Rock Slope
- Địa điểm:
- Guizhou Province, China
- Thời gian thi công:
- 2016 - 2017
- Người thiết kế:
- Guizhou Metallurgical Design and Research Institute
- Dự án:
- Rock slope stabilization using anchored reinforced concrete beams with two rows anti-slide piles at the lower edge of the slope.
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - PTHH
GEO 5 - Cọc chống trượt
- Tài liệu:
-
Output protocol from the GEO5 Slope Stability program
Slope stabilization using three rows of Anti-slide piles
- Tên dự án:
- Slope stabilization using three rows of Anti-slide piles
- Địa điểm:
- Jiangsu Province, China
- Thời gian thi công:
- 2016
- Người thiết kế:
- Geological Engineering Investigation of Jiangsu Province
- Dự án:
- Slope stabilization with three rows of Anti-slide piles. Three separate series of stabilization piles: Pile diameter: 1m, 1m, 1.5m Pile depth: 9m, 11m, 15m Stabilization pile wall width: 19m, 27m, 33m Length of the stabilized part of the slope: approx. 120m
- Phần mềm:
-
GEO 5 - Ổn định mái dốc
GEO 5 - Cọc chống trượt
- Tài liệu:
-
Output protocol from the GEO5 Slope Stability program
Shanghe Hanghu East Station - Retaining Wall
- Tên dự án:
- Shanghe Hanghu East Station - Retaining Wall
- Địa điểm:
- Zhejiang Province, China
- Thời gian thi công:
- 2014 - 2016
- Người thiết kế:
- China Railway Siyuan Survey and Design Group Co., Ltd.
- Dự án:
- Slope supporting structures at the railway corridor. Retaining reinforced concrete wall based on piles and reinforced MSE wall. Depth of foundation piles: 18.5 m Height of the reinforced retaining wall: 4.6 m Height of MSE wall: 4.6 m Number of rows of geo-reinforcements: 4 Reinforcement length: 4m
- Phần mềm:
-
GEO 5 - Tường MSE
GEO 5 - Tường chắn kiểu công xon
GEO 5 - Cọc
- Tài liệu:
-
Output protocol from the GEO5 Cantilever wall and MSE wall program
Niuzhaishan Tunnel
- Tên dự án:
- Niuzhaishan Tunnel
- Địa điểm:
- Fujian Province, China
- Thời gian thi công:
- 2012 - 2014
- Người thiết kế:
- Geological Engineering Investigation of Fujian Province
- Dự án:
- The Niuzhaishan Tunnel in total length 1,697 m.
The double arc-tube highway tunnel will span four lanes in each direction.
Excavation tube width: 32 m.
Excavation tube height: 22,5 m. - Phần mềm:
-
GEO 5 - PTHH
GEO 5 - PTHH – Hầm
GEO 5 - Địa tầng
- Tài liệu:
-
China Niuzhaishan Tunnel Output Report
Construction of Expressway S7, Poland
- Tên dự án:
- Construction of Expressway S7, Koszwały-Nowy Dwór Gdański
- Địa điểm:
- Poland
- Thời gian thi công:
- 2018
- Người thiết kế:
- INGEO Sp. z o.o.
Dr. Ing. Marcin Blockus - Dự án:
- Stabilization of the expressway subsoil using a group of piles.
Pile diameter: 0,40m
Number of drilled displament piles: 186000
- Phần mềm:
-
GEO 5 - PTHH
- Tài liệu:
-
poland-subsoil-stabilization-expressway.pdf